Energy for Mam Rashan
GS-1685 ↗ · current registry ID: GS6460
#1142of 1801 in Gold Standard (GS)
Audit Analysis
Energy for Mam Rashan is a micro-scale renewable electrification project in Iraq with a VVB-confirmed investment additionality test and a reasonable grid emission factor baseline. However, the project carries significant operational risk signals: seven material findings, multiple corrective action requests, no buffer pool, unaddressed reversal risk, and seven inter-document contradictions that undermine data reliability. The low extraction confidence and absence of a verified ERR figure further limit confidence in the claimed 730 tCO₂e for the first monitoring period.
Red Flags
- Seven material findings and at least eleven corrective action requests reported in the 2026 verification report, including repeated plant maintenance interruptions and supply disruptions that reduced emission reductions below estimates
- No buffer pool percentage stated and reversal events explicitly 'not addressed' in the verification report, leaving permanence risk unmitigated
- Seven contradictions across documents, including conflicting leakage justifications ('deemed negligible' vs 'quantified'), conflicting additionality test types (investment vs combined), and conflicting safeguards documentation
- Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable, reducing reliability of the entire evidence base
- Total ERR verified figure is not stated in the extracted record; only the claimed 730 tCO₂e from the monitoring report is available, preventing independent verification of the credit quantity
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 44 | 0 | 44 | |
| 2019 | 159 | 0 | 159 | |
| 2020 | 111 | 0 | 111 | |
| 2021 | 581 | 314 | 267 | |
| 2022 | 451 | 0 | 451 | |
| 2023 | 605 | 0 | 605 | |
| 2024 | 609 | 0 | 609 | |
| Total | 2,560 | 314 | 2,246 |
Risk Indicators
VVB-confirmed investment test
reversals not addressed
0% deduction, 'deemed negligible' but contradicts earlier 'quantified'
Project-specific baseline; grid EF stated but no fnrb method
FPIC, grievance mechanism, benefit sharing documented
CCP not mentioned; CORSIA eligibility not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →