ERH Biogas recovery, heat and electricity generation from effluents ponds in Honduras
#46of 268 in Biogas#4of 20 in Honduras#589of 1459 in CDM (UNFCCC)#11of 55 in AMS-III.H
Audit Analysis
A CDM biogas project in Honduras with VVB-confirmed additionality and a reasonable grid emission factor, but significant gaps in monitoring data, a project-specific baseline, and a 0% leakage deduction whose justification is contradicted by an appendix. The absence of verified emission reduction figures and detailed safeguards documentation limits confidence in the project's environmental integrity.
Red Flags
- Leakage deduction of 0% with justification described as 'deemed negligible' in the validation report, yet the appendix characterises it as 'quantified' — an unresolved contradiction that undermines confidence in the leakage treatment
- No verified emission reduction figures or monitoring period data found in any available document, making it impossible to confirm whether the 240,881 tCO2e lifetime claim was actually delivered
- Two material findings at validation (calibration frequency of measuring equipment and operation of existing biomass generators) with no documented corrective actions or follow-up verification
- Baseline is project-specific and described as 'mixed' measured and modelled, with no baseline reassessment data available
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
no reversal data
0% deduction; contradictory justification
Project-specific; mixed measured/modelled
Mentioned but not detailed; no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →