Eritrea Community Boreholes
GS-907 ↗ · current registry ID: GS5125
#671of 1329 in Industrial#27of 38 in Eritrea#1018of 1801 in Gold Standard (GS)
Audit Analysis
The Eritrea Community Boreholes project (GS-907) displaces firewood for water heating with borehole water, and while additionality is VVB-confirmed and no reversal events have occurred, the project carries significant data-quality concerns: 16 corrective action requests, an initial baseline water-boiling test error, and a 0% leakage deduction that conflicts with a 5% figure in an appendix. The FNRB value discrepancy (0.97 vs 0.79 across verification documents) and the 20% downward revision of verified ERs between two verification reports raise over-crediting risk.
Red Flags
- FNRB value of 0.97 in the December 2024 verification report conflicts with 0.79 in the March 2024 validation report — a 23% difference that directly inflates claimed credits if the lower value is correct
- Leakage deduction of 0% ('deemed negligible') in the verification report contradicts a 5% figure in an appendix; for a borehole project displacing firewood, reversion to wood-burning is a realistic leakage pathway
- Verified ERs dropped from 119,250 tCO2e (April 2024 VR) to 94,928 tCO2e (December 2024 VR), a 20% downward revision within the same verification cycle, indicating initial over-estimation
- 16 corrective action requests and 3 clarification requests across verification cycles, including an initial baseline water-boiling test conducted with kerosene that had to be redone, signal persistent MRV data-quality weaknesses
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 13,258 | 13,258 | 0 | |
| 2017 | 98,195 | 98,195 | 0 | |
| 2018 | 123,596 | 113,596 | 10,000 | |
| 2019 | 124,389 | 80,142 | 44,247 | |
| 2020 | 166,973 | 136,276 | 30,697 | |
| 2021 | 176,381 | 41,316 | 135,065 | |
| 2022 | 147,241 | 84,745 | 62,496 | |
| 2023 | 64,758 | 74 | 64,684 | |
| Total | 914,791 | 567,602 | 347,189 |
Risk Indicators
VVB-confirmed combined test
no reversals
0% deduction contradicted by 5% appendix
Project-specific, reassessed 2023
FPIC, grievance, benefit-sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →