Evlayim Landfill Project

CDM-3820 ↗

#107of 189 in Methane#3of 8 in Israel#1095of 1459 in CDM (UNFCCC)#98of 159 in ACM0001

4.6/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
4.5
Documentation
3.5

Audit Analysis

The Evlayim Landfill Project is a CDM-registered methane capture project in Israel with a confirmed investment-test additionality assessment by TÜV Nord, but the available record is limited to the 2010 validation report with seven material findings and no verification or monitoring data. The low extraction confidence and absence of any verified emission reduction figures create significant uncertainty about actual delivery and ongoing compliance.

Red Flags

  • Seven material findings in the validation report (2010) covering gaps in financial analysis, metering accuracy, QA/QC procedures, and sensitivity analysis — resolution status not confirmed in the extracted record
  • No verification report or monitoring data found in the extracted record; total verified ERR is not stated, making it impossible to confirm actual credit delivery
  • Minimum extraction confidence rated low, indicating at least one key document was poorly readable and critical data may be missing
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis in the available documents

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, modeled, no reassessment data

Safeguards

Safeguards mentioned, benefit sharing described, but FPIC an

Double-claim

CCP and CORSIA status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents