Expansion Project of Sanjiangkou Hydro-electric Power Station in the reach of Supa River, Yunnan province, China
#786of 1084 in China#1032of 1459 in CDM (UNFCCC)#1014of 1287 in ACM0002
Audit Analysis
A CDM hydro expansion project in Yunnan, China, with VVB-confirmed additionality and a reasonable negligible-leakage claim, but undermined by a heavy list of material findings (IRR errors, emission-factor miscalculations, outdated baseline data) and four cross-document contradictions on grid emission factor, total ERR, baseline method, and crediting period. The project's integrity is further weakened by the absence of a verified ERR figure and the lack of any buffer or permanence mechanism beyond the inherent avoidance nature of hydro.
Red Flags
- Twelve corrective actions were required during verification, including errors in IRR/NPV calculations, emission-factor miscalculations, and use of outdated baseline data in the PDD
- Total ERR differs by roughly 14% between two monitoring reports (82,812 vs 94,879 tCO₂e), with no verified ERR figure available to resolve the discrepancy
- Baseline method is described as 'project' in the 2012 monitoring report but 'jurisdictional' in the 2009 validation report, creating ambiguity about the reference case
- Grid emission factor of 0.77835 tCO₂/MWh is based on 2006 data, and an older value of 0.7 appears in an undated document, raising questions about baseline currency
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 46,646 | 0 | 46,646 | |
| 2011 | 94,879 | 0 | 94,879 | |
| 2012 | 82,812 | 0 | 82,812 | |
| Total | 224,337 | 0 | 224,337 |
Risk Indicators
VVB-confirmed combined test
Hydro avoidance – no reversal risk
Negligible, consistent with grid displacement
Project-specific, method contradiction, 2006 grid EF
Mentioned and benefit-sharing described; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →