Feira de Santana Landfill Gas Project
#48of 189 in Methane#68of 211 in Brazil#677of 1459 in CDM (UNFCCC)#43of 159 in ACM0001
Audit Analysis
The Feira de Santana Landfill Gas Project has a solid additionality foundation confirmed by DNV via a combined test, but suffers from a project-specific baseline with a contradictory characterization (measured vs. modeled across documents), a thin 0% leakage justification, and several critical MRV data points that are absent from the extracted record. The project delivered roughly 55% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is conservative but reflects limited operational data.
Red Flags
- Baseline characterization contradicts between the validation report (modeled) and the monitoring report (measured), undermining confidence in the baseline methodology
- Leakage deduction of 0% justified only as 'deemed negligible' without quantified analysis, which is thin for a landfill gas project where uncontrolled CH4 emissions are a known risk
- No buffer pool or permanence mechanism is stated in the extracted record, leaving reversal risk unaddressed
- Multiple critical MRV fields (FNRB method, usage monitoring method, verified ERR, usage rate) are absent from the available documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
no reversals reported
0% deduction, 'deemed negligible' only
Project-specific; measured vs. modeled contradiction
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →