FELDA Trolak and Sampadi Composting Plants

CDM-2517 ↗

#62of 1329 in Industrial#1of 16 in Malaysia#231of 1459 in CDM (UNFCCC)#5of 43 in AMS-III.F

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
5.5
Documentation
6.5

Audit Analysis

A CDM methane-avoidance composting project in Malaysia with VVB-verified investment-test additionality and conservative baseline adjustments, but weakened by a project-specific baseline, a 0% leakage deduction with contradictory justifications across documents, and a significant discrepancy between the validation and monitoring ERR figures. The project shows no reversal events and no corrective actions, but several key MRV parameters remain unreported.

Red Flags

  • ERR discrepancy of ~34% between the validation report (48,086 tCO₂e, 2009) and the monitoring report (31,769 tCO₂e, 2013) is not fully explained by the documented conservative adjustments
  • Leakage justification is contradictory: the monitoring report (2013) states 'deemed negligible' while the financial document (2008) references a 'quantified' approach, with a 0% deduction applied
  • Baseline is project-specific rather than jurisdictional, and the PDD (2009) describes it as 'modeled' while the monitoring report (2013) calls it 'measured' — the methodological basis is unclear

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

no reversals reported

Leakage

0% deduction; contradictory justifications

Baseline

Project-specific; measured vs modeled discrepancy

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not docum

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29AMS-III.F

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents