FELDA Trolak and Sampadi Composting Plants
#62of 1329 in Industrial#1of 16 in Malaysia#231of 1459 in CDM (UNFCCC)#5of 43 in AMS-III.F
Audit Analysis
A CDM methane-avoidance composting project in Malaysia with VVB-verified investment-test additionality and conservative baseline adjustments, but weakened by a project-specific baseline, a 0% leakage deduction with contradictory justifications across documents, and a significant discrepancy between the validation and monitoring ERR figures. The project shows no reversal events and no corrective actions, but several key MRV parameters remain unreported.
Red Flags
- ERR discrepancy of ~34% between the validation report (48,086 tCO₂e, 2009) and the monitoring report (31,769 tCO₂e, 2013) is not fully explained by the documented conservative adjustments
- Leakage justification is contradictory: the monitoring report (2013) states 'deemed negligible' while the financial document (2008) references a 'quantified' approach, with a 0% deduction applied
- Baseline is project-specific rather than jurisdictional, and the PDD (2009) describes it as 'modeled' while the monitoring report (2013) calls it 'measured' — the methodological basis is unclear
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
no reversals reported
0% deduction; contradictory justifications
Project-specific; measured vs modeled discrepancy
Safeguards mentioned; FPIC and grievance mechanism not docum
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →