Integrity
verified Additionality was confirmed by the VVB using an investment test, which is stronger than an unverified claim.
missing The verification report reports a missing non-permanence risk report, non-eligible areas inside the project area, and 8 assessment findings that still needed resolution.
Transparency
verified The monitoring period, VVB name, and verified emission reductions are stated in the available record, and the project has a named verifier.
missing The report says there was not sufficient information to reproduce the net GHG emission reductions calculation, and key public-facing fields such as usage monitoring details are not stated.
Claim Safety
verified Leakage is treated with a quantified 5% deduction, which is better than leaving leakage unaddressed.
missing The project is on hold and the record contains contradictions on credited emissions, buffer pool size, and reversal history, increasing over-crediting and claim-risk concerns.
Documentation
verified The record draws on many documents, with 27 documents used and medium extraction confidence rather than low.
missing Several required items are missing or only partially documented, including the non-permanence risk report and reproducible calculation appendices.
Detailed Analysis
Integrity
The project has a positive additionality signal because the VVB confirmed an investment test, and the monitoring record shows a quantified leakage deduction of 5% plus a 10% buffer pool in the latest extracted facts. Against that, the verification report states that the non-permanence risk report was not submitted, non-eligible areas were included inside the project area, and the VVB raised 8 assessment findings with corrective actions still outstanding. The September 2021 fire was reportedly contained without significant damage, so I did not treat it as a confirmed reversal, but the earlier contradiction about reported reversals still lowers confidence. Overall, the integrity picture is mixed and weakened by boundary and permanence-control issues.
Transparency
The project has some basic transparency elements: a named VVB, a defined monitoring period, and a verified emissions figure in the extracted record. However, the verification report explicitly says there was not sufficient information to reproduce the net GHG emission reductions calculation, and the usage monitoring method is not stated in available documents. Several registry-relevant fields are also missing from the extracted record, which limits public traceability. This is below average transparency for a forestry crediting project.
Claim Safety
Claim safety is constrained by the on-hold registry status and by contradictions in the record. I privileged the most recent extracted values where they appear to come from later documents, but the contradictions on credited emissions, buffer pool percentage, reversal events, and crediting period indicate reliability problems that increase over-crediting risk. The quantified leakage deduction helps, but the project-specific baseline and unresolved accounting issues keep the claim-safety score low. I did not see evidence of dual registration or double issuance, but CORSIA and CCP status are not stated.
Documentation
Documentation breadth is moderate because 27 documents were used and the extraction confidence is medium rather than low. Even so, the record is incomplete on several important points: the non-permanence risk report is missing, the calculation appendix was not sufficient for reproduction, and some monitoring details are not stated. The project also has multiple contradictions across documents, which reduces trust in the documentation set. The recency of the monitoring period is reasonably good, but the unresolved findings prevent a stronger score.
Overall
I privileged the later extracted values for buffer pool, reversal history, credited emissions, and crediting period because they appear to come from more recent documents, but the contradictions themselves are a material reliability concern and justify a downward adjustment. The project’s latest record still shows serious verification gaps, including a missing non-permanence risk report, non-eligible areas in the project boundary, and unresolved assessment findings. Because integrity is only modest and the registry status is on hold, the overall assessment remains cautious.
Audit Analysis
This REDD project has some positive elements, including VVB-confirmed additionality, a 10% buffer pool, FPIC, and a quantified leakage deduction. However, the record also shows major verification weaknesses, including a missing non-permanence risk report, non-eligible areas in the project boundary, and unresolved calculation reproducibility issues. The registry status is on hold, which further weakens confidence in the claims.
Project Description
The FORTALEZA ITUXI REDD PROJECT is focused on protecting forests in Lábrea, Brazil, an area with high deforestation rates. The project is expected to result in a net GHG emission reduction of 720,470 tCO2e and will provide technical training on sustainable cattle raising and forest management, as well as other initiatives such as seedling production and monitoring of labor conditions. It will also generate job opportunities beyond timber management through the "Castanhal Fortaleza" company.
Red Flags
- The verification report lists a missing non-permanence risk report and 8 assessment findings, with several corrective actions still required.
- The project boundary and accounting appear problematic because non-eligible areas were included in the KML file and the emissions calculation could not be reproduced from the submitted materials.
- There are material contradictions across documents on buffer pool size, reversal events, credited emissions, and the crediting period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 928,856 | 928,706 | 150 | |
| 2017 | 25,773 | 25,489 | 284 | |
| 2019 | 144,993 | 144,993 | 0 | |
| 2020 | 20,795 | 2,185 | 18,610 | |
| 2021 | 134,638 | 50,180 | 84,458 | |
| Total | 1,255,055 | 1,151,553 | 103,502 |
Cosa migliorerebbe questo punteggio
- Upload the missing non-permanence risk report and close all outstanding corrective actions with clear evidence in the registry.
- Provide a fully reproducible emissions calculation package, cleanly delineated KML boundaries, and a reconciled explanation for the contradictions in buffer pool, reversals, credited emissions, and crediting period.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
buffer pool present but reversal history disputed
quantified 5% leakage deduction
project baseline with reassessment timing not stated
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →