Fuerza Eolica del Istmo is a CDM wind project with a VVB-confirmed investment additionality test, a jurisdictional baseline, and a reasonable 0% leakage deduction for a renewable-energy avoidance project. The main concerns are a material finding on the monitoring plan (shared transmission line with Phase II), several key transparency fields left unreported (verified ERR, FNRB, usage monitoring method), and four cross-document contradictions that, while largely explainable by unit differences or different reporting periods, introduce some data-reliability uncertainty.
Red Flags
- Material finding in the 2013 verification report: the project participant was unable to implement the registered monitoring plan due to a shared transmission line with the Phase II project; the plan was revised to use transmission-loss factors and electricity-bill cross-checks, which is a weaker monitoring approach than direct metering.
- The additionality test type is reported as 'investment' in the 2009 validation report but as 'combined' in the 2013 PDD, creating ambiguity about which test the VVB actually verified.
- Total verified ERR for the full three-year monitoring period (2012–2015) is not stated in the extracted record, preventing a full pro-rata delivery check beyond the first-year figure.
- CORSIA eligibility and CCP status are both not stated in any available document, leaving the double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 42,413 | 0 | 42,413 | |
| 2014 | 40,329 | 0 | 40,329 | |
| 2016 | 286,039 | 0 | 286,039 | |
| Total | 368,781 | 0 | 368,781 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional grid baseline
Safeguards mentioned, FPIC and grievance mechanism not state
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →