Fujian Nan'an Shengda Aluminium Recycling Project
#1031of 1084 in China#1191of 1339 in Verra (VCS)#4of 5 in VMR0007
Audit Analysis
The Fujian Nan'an Shengda Aluminium Recycling Project holds a VCS registration under VMR0007 with a VVB-verified investment additionality test, but the verification report identified 14 material findings spanning missing baseline equations, IRR/FSR calculation gaps, methodology applicability ambiguity (Case A vs B), and inclusion of non-qualifying steel material. Four cross-document contradictions—including a 55% discrepancy in claimed ERR and a 17.5% grid emission factor mismatch—undermine confidence in the credit quantity. The project's safeguards (FPIC, grievance mechanism) are present but inconsistently documented, and the 0% leakage deduction is supported by contradictory justifications across the verification and monitoring reports.
Red Flags
- 14 material findings in the verification report, including missing GHG reduction calculations, missing baseline equations, and missing consent documentation in the PD&MR
- 55% discrepancy in total ERR between the validation report (92,095) and the financial document (59,453)
- Methodology applicability ambiguity (Case A vs B) and inclusion of steel material in credit calculations, raising over-crediting risk
- Contradictory leakage justifications: verification report states 'deemed negligible' while the monitoring report states 'quantified'
- IRR/FSR additionality calculations flagged as unclear, with a 10% discount rate and missing depreciation identified as errors
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified investment test but IRR/FSR calculations flagged as unclear
reversal risk unquantified for recycling project
0% deduction with contradictory justifications across documents
Project-specific baseline; equations missing; grid EF contradicted
FPIC and grievance mechanism present but consent documentation missing in PD&MR
CORSIA and CCP status not stated in any available document
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →