*Fujian Zhangpu Liuao 45MW Wind Power Project
Score Breakdown
Integrity
verified The verification report from SGS United Kingdom Ltd confirms an investment-test additionality approach and no reversal events during the monitoring period.
missing Leakage is not clearly resolved in the verification record, and the baseline was last reassessed in 2007, which is dated.
Transparency
verified The project has a named VVB, a defined monitoring period, and a verified emissions result of 71,812 credits in the verification report.
missing Key MRV details are missing or not stated in available documents, including the usage monitoring method and several emissions-input fields.
Claim Safety
verified The project is a wind project under ACM0002, which is generally lower risk than many land-use crediting activities.
missing The verification report leaves leakage unresolved and the project is CCP approved, which does not eliminate over-crediting or claim-risk concerns.
Documentation
verified Three core document types were available, and the verification report is dated 2013, showing reasonably recent review relative to the crediting period.
missing The extraction confidence is only medium, and the verification report lists multiple CARs and FARs with follow-up corrections required.
Detailed Analysis
Integrity
The project uses ACM0002 with an investment-test additionality case, and the verification report by SGS United Kingdom Ltd reports no reversal events during the monitoring period. That said, the baseline was last reassessed in 2007, which is old, and leakage is not clearly settled in the verification record. The presence of multiple CARs and FARs also suggests the project needed substantive follow-up before the verification could be finalized.
Transparency
The documentation includes a named verifier, a clear monitoring period from 2011-05-28 to 2012-05-27, and a verified emissions quantity of 71,812. However, several MRV fields are not stated in available documents, including the usage monitoring method and multiple grid-factor inputs. The record is therefore usable but incomplete for a full public audit trail.
Claim Safety
As a wind project, the underlying activity is relatively low risk compared with projects that have major permanence or land-use exposure. Even so, the verification report does not clearly resolve leakage, and the project is marked CCP approved, which does not by itself remove over-crediting concerns. The absence of several quantified inputs also limits confidence in the exact claim strength.
Documentation
Three core documents were used, but the extraction confidence is only medium, so at least one source was not fully clear. The verification report contains several corrective-action items, and the record also shows a mismatch in the crediting-period dates between the verification report and the PDD. Those issues reduce confidence in the completeness and consistency of the documentation set.
Overall
I privileged the verification report for operational facts such as the verified emissions result, the VVB opinion, and the monitoring-period findings because it is the most recent assurance document. I also privileged the verification report over the PDD on the crediting-period dates because it is later and more specific to the monitored period, but I treated the discrepancy as a reliability weakness. The contradiction on leakage is material: the verification record says leakage was not addressed, while the monitoring report is described as quantified, so I scored conservatively and reduced confidence accordingly.
Audit Analysis
This is a standard wind project with a VVB verification, an investment-test additionality case, and no reported reversal events during the monitoring period. However, several key items are either not stated or inconsistently documented, including leakage treatment, baseline reassessment timing, and the project’s crediting-period dates across documents, which weakens confidence in the record.
Project Description
Developer: CWEME Type: Wind Size: Large scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2007-12-01 → 2014-11-30 Estimated annual credits: 84130 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 7: Affordable and Clean Energy, Goal 13: Climate Action
Red Flags
- Leakage treatment is inconsistent: the verification record says leakage was not addressed, while the monitoring report is said to quantify it.
- The crediting period differs between the verification report and the PDD, creating a documentation reliability issue.
- Material findings and corrective actions were raised in verification, indicating the project was not fully clean at review.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 60,506 | 0 | 60,506 | |
| 2009 | 71,048 | 0 | 71,048 | |
| 2010 | 62,743 | 0 | 62,743 | |
| 2011 | 75,303 | 0 | 75,303 | |
| 2012 | 32,476 | 0 | 32,476 | |
| Total | 302,076 | 0 | 302,076 |
Cosa migliorerebbe questo punteggio
- Provide a fully reconciled leakage assessment and explain the difference between the verification report and monitoring report.
- Publish a complete MRV package with all key inputs, the usage monitoring method, and a clear reconciliation of the crediting-period dates.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Investment test present, but VVB confirmation not explicit
Wind project with no reversal events reported
Leakage treatment inconsistent across documents
Project-specific baseline with dated reassessment
FPIC, grievance mechanism, and safeguards are documented
CCP approved; no evidence of double registration
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →