Gansu Datang Yumen 49 MW Wind Power Project
#548of 1935 in Renewable energy#249of 1084 in China#366of 1459 in CDM (UNFCCC)#416of 1287 in ACM0002
Audit Analysis
A 49 MW onshore wind project in Gansu, China, validated under CDM methodology ACM0002 with a jurisdictional baseline and VVB-confirmed additionality. The project shows no material findings or corrective actions, and the 0% leakage deduction is reasonable for a generation project. However, the absence of monitoring reports, FNRB data, and CORSIA/CCP status information limits the depth of verification possible.
Red Flags
- No monitoring reports found in the extracted record; actual verified emissions reductions for any period are unavailable
- FNRB (first net registered benefit) value and method are not stated in any available document
- One of the four source documents is listed as 'unknown' type, reducing confidence in the completeness of the evidence base
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 52,963 | 0 | 52,963 | |
| 2010 | 74,888 | 0 | 74,888 | |
| 2011 | 81,228 | 0 | 81,228 | |
| 2012 | 124,947 | 0 | 124,947 | |
| 2013 | 35,719 | 0 | 35,719 | |
| Total | 369,745 | 0 | 369,745 |
Risk Indicators
VVB-confirmed
Generation project, minimal reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional, reassessed 2019
Mentioned but FPIC and grievance mechanism not detailed
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →