Gansu Guazhou Daliangxi Wind Power Project
#1467of 1935 in Renewable energy#917of 1084 in China#1213of 1459 in CDM (UNFCCC)#1121of 1287 in ACM0002
Audit Analysis
A CDM wind power project in Gansu, China, validated by CTI under the well-established ACM0002 methodology with a jurisdictional grid-emission-factor baseline. The project type is inherently low-risk for permanence and leakage, but the available record contains only validation-stage documents with no monitoring or verification reports, and the extraction confidence is low, leaving significant gaps in post-implementation evidence.
Red Flags
- No verification or monitoring reports are present in the extracted record; only a validation report (Jan 2019) and PDD are available, so actual emissions reductions over the 2017–2024 crediting period are unconfirmed.
- The PDD (Jan 2019) states a total ERR of 618,527 tCO₂ while the validation report (Jan 2019) states 88,361 tCO₂; although this is consistent with a 7-year total versus an annual figure, the discrepancy was not explicitly reconciled in the documents.
- Minimum extraction confidence is rated low, and one of the four evidence documents is listed as 'unknown', reducing reliability of the extracted data.
- Additionality test type and VVB confirmation are not specified in the extracted record, leaving the additionality assessment unverified in the available data.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 101,809 | 0 | 101,809 | |
| 2012 | 92,556 | 0 | 92,556 | |
| 2013 | 55,291 | 0 | 55,291 | |
| Total | 249,656 | 0 | 249,656 |
Risk Indicators
VVB validated but test type not specified in record
Avoidance project, no reversal events reported
0% deemed negligible, consistent with grid displacement
Jurisdictional grid EF, reassessed 2019
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →