Skip to main content
CDMWindChinaACM0002

Gansu Tianrun Liuyuan 1st Stage 49.5MW Wind Park Project

CDM-3919 ↗

#678of 1084 in China#890of 1459 in CDM (UNFCCC)#915of 1287 in ACM0002

4.9/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.5
Documentation
5.0

Audit Analysis

A 49.5 MW onshore wind project in Gansu, China, registered under CDM with a jurisdictional grid baseline and an established VVB (CTC). The project shows no material findings or corrective actions, but the extracted record contains significant gaps in additionality documentation, verified emissions reductions, and safeguards, compounded by contradictions between the validation and monitoring reports on ERR figures and crediting period dates.

Red Flags

  • ERR figures differ by a factor of ~7 between the validation report (89,813 tCO2e) and the monitoring report (628,691 tCO2e); the basis for each figure is not clarified in the extracted record
  • Crediting period start date differs between documents: January 2018 (validation report) vs October 2018 (monitoring report), creating ambiguity about the actual project start
  • Additionality test type and VVB confirmation are not stated in the extracted data, leaving the additionality claim unverified in the available record
  • Leakage justification is contradictory: the monitoring report says 'quantified' while the validation report says 'deemed negligible', yet both documents report a 0% deduction

Credit Vintages

IssuedRetiredAvailable
2012
107,4510107,451
2013
92,202092,202
Total199,6530199,653

Risk Indicators

Additionality

Test type not stated in extracted record

Permanence

Avoidance project; no reversal events

Leakage

0% deduction; justification inconsistent across docs

Baseline

Jurisdictional grid EF (2017); reassessed 2019

Safeguards

Mentioned but no FPIC or grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents