Gas Flare Recovery at Suez Oil Processing Company, Egypt
#9of 9 in Egypt#1160of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM gas flare recovery project in Egypt validated by SGS UK using the standard AM0055 methodology, with VVB-confirmed additionality via a barrier test and a measured project-specific baseline. However, the record is heavily incomplete: no monitoring data, no verified emission reductions, no FNRB values, and two inter-document contradictions (leakage treatment and additionality test type) reduce confidence. The low extraction confidence and absence of any post-validation monitoring reports leave significant evidence gaps.
Red Flags
- No monitoring period or verified emission reduction figures found in any available document — the project's actual performance is entirely unverified in the extracted record
- Contradiction between the validation report (leakage 'deemed negligible') and the appendix (leakage 'quantified') creates uncertainty about whether a quantitative leakage assessment was actually performed
- Low extraction confidence indicates at least one key document was poorly readable, undermining reliability of all extracted facts
- Four Corrective Action Requests (CARs) were raised at validation, including issues with NCV values, IPCC references, and project start date definition
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
mixed evidence / unresolved risk
0% deduction, contradictory justifications
Project-specific, measured, no reassessment data
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →