Skip to main content
CDMWindIndiaAMS-I.D

Generation of electricity from 12.8 MW capacity wind mills by Avinash Bhosale group at Bhambarwadi, Maharashtra

CDM-1550 ↗

#89of 975 in India#107of 1459 in CDM (UNFCCC)#65of 806 in AMS-I.D

6.4/ 10
Integrity
6.0
Transparency
6.5
Claim Safety
7.0
Documentation
6.0

Audit Analysis

A 12.8 MW CDM wind project in Maharashtra with a jurisdictional baseline and VVB-verified investment additionality test. The project delivered approximately 101% of its pro-rata emission reduction expectation for the monitored period, indicating no over-crediting. However, the validation process required 15 corrective action requests, and several safeguards and monitoring details remain undocumented.

Red Flags

  • 15 corrective action requests raised during validation, including weak additionality arguments, inconsistent CER figures between PDD and spreadsheets, and inadequate stakeholder consultation across all four villages
  • Leakage justification is inconsistent between two monitoring reports: 'deemed negligible' (Jan 2012) vs 'quantified' (Oct 2012), with a 0% deduction in both cases
  • No FPIC, grievance mechanism, or usage monitoring method documented in the available record

Credit Vintages

IssuedRetiredAvailable
2009
17,259017,259
2010
18,073018,073
2011
16,147016,147
2012
18,069018,069
2013
15,425015,425
Total84,973084,973

Risk Indicators

Additionality

VVB-confirmed but initially weak

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, inconsistent justification

Baseline

Jurisdictional grid EF, standard CDM

Safeguards

Mentioned but FPIC/grievance absent

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29AMS I. D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents