Generation of electricity from 12.8 MW capacity wind mills by Avinash Bhosale group at Bhambarwadi, Maharashtra
#89of 975 in India#107of 1459 in CDM (UNFCCC)#65of 806 in AMS-I.D
Audit Analysis
A 12.8 MW CDM wind project in Maharashtra with a jurisdictional baseline and VVB-verified investment additionality test. The project delivered approximately 101% of its pro-rata emission reduction expectation for the monitored period, indicating no over-crediting. However, the validation process required 15 corrective action requests, and several safeguards and monitoring details remain undocumented.
Red Flags
- 15 corrective action requests raised during validation, including weak additionality arguments, inconsistent CER figures between PDD and spreadsheets, and inadequate stakeholder consultation across all four villages
- Leakage justification is inconsistent between two monitoring reports: 'deemed negligible' (Jan 2012) vs 'quantified' (Oct 2012), with a 0% deduction in both cases
- No FPIC, grievance mechanism, or usage monitoring method documented in the available record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 17,259 | 0 | 17,259 | |
| 2010 | 18,073 | 0 | 18,073 | |
| 2011 | 16,147 | 0 | 16,147 | |
| 2012 | 18,069 | 0 | 18,069 | |
| 2013 | 15,425 | 0 | 15,425 | |
| Total | 84,973 | 0 | 84,973 |
Risk Indicators
VVB-confirmed but initially weak
Avoidance project, no reversal risk
0% deduction, inconsistent justification
Jurisdictional grid EF, standard CDM
Mentioned but FPIC/grievance absent
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →