Generation of electricity from 3.2 MW capacity wind mills by Gujarat JHM at Bhambarwadi, Maharashtra
#111of 975 in India#130of 1459 in CDM (UNFCCC)#78of 806 in AMS-I.D
Audit Analysis
A 3.2 MW CDM wind project in Maharashtra with a well-verified investment-test additionality assessment and jurisdictional grid baseline. The project shows no reversal risk and reasonable delivery, though leakage treatment is inconsistent across documents and safeguards documentation (FPIC, grievance mechanism) is absent from the extracted record. Overall a solid but mid-tier CDM-era wind credit with some documentation gaps.
Red Flags
- Leakage justification is inconsistent: the 2012 monitoring report states leakage was 'quantified' while the 2011 report describes it as 'deemed negligible', yet the deduction is 0% in both cases
- No FPIC or grievance mechanism is documented in the extracted record, despite safeguards being mentioned
- Grid emission factor is based on 2007 data (0.906 tCO2/MWh), which is over 15 years old at the time of assessment
- CORSIA eligibility and CCP status are not stated in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 6,764 | 0 | 6,764 | |
| 2012 | 6,109 | 0 | 6,109 | |
| 2013 | 7,105 | 0 | 7,105 | |
| Total | 19,978 | 0 | 19,978 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, inconsistent justification
Jurisdictional grid EF baseline
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →