GGP Biogas Project
#155of 268 in Biogas#21of 33 in Indonesia#1100of 1459 in CDM (UNFCCC)#3of 7 in ACM0014
Audit Analysis
The GGP Biogas Project in Indonesia is a CDM methane-avoidance project with VVB-confirmed additionality and detailed monitoring equipment, but it is undermined by 19 material findings, 25 corrective actions, a 39% under-delivery relative to the PDD estimate, and a project-specific baseline with a thin leakage justification. The volume of unresolved issues at verification raises serious concerns about whether the project operated as designed and whether the claimed reductions are robust.
Red Flags
- 19 material findings and 25 corrective actions identified in the verification report, including flow meter accuracy below required class, uncalibrated V-Notch weir, and only one of two planned boilers retrofitted with a biogas burner
- Verified ERR of 2,585 tCO2e represents only ~4% of the pro-rata PDD expectation (~65,300 tCO2e for the 4-year monitoring window), a 39.22% shortfall flagged in the record
- Contradiction between the verification report (2,585 tCO2e) and the PDD (40,813 tCO2e) for total ERR claimed, with no reconciliation documented
- Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis for a biogas/digestion project where fugitive methane is a known risk
- No buffer pool, no reversal-event tracking, and no permanence mechanism documented under the CDM framework
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 2,585 | 0 | 2,585 | |
| 2019 | 109,191 | 0 | 109,191 | |
| Total | 111,776 | 0 | 111,776 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' only
Project-specific, measured, no reassessment date
Safeguards mentioned, benefit sharing described; FPIC and gr
CORSIA and CCP status not stated in record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →