Gianyar Waste Recovery Project

GS-2066 ↗ · current registry ID: GS7561

#342of 352 in Biomass#32of 33 in Indonesia#1792of 1801 in Gold Standard (GS)#43of 43 in AMS-III.F

1.9/ 10
Integrity
2.0
Transparency
1.5
Claim Safety
2.0
Documentation
2.5

Audit Analysis

The Gianyar Waste Recovery Project is effectively defunct: the main facility (Temesi Recycling) ceased operations in 2022 after a tropical storm destroyed its roof, and the project faces a funding gap with no government support. The 2023 verification report lists 17 material findings and 13 corrective actions covering missing legal ownership evidence, unverified barrier justifications, inconsistent emissions calculations, and absent annual monitoring reports. With a 4% buffer pool, a project-specific modeled baseline, contradictory leakage justifications, and no permanence or reversal data, the integrity of previously issued credits is severely compromised.

Red Flags

  • Main facility Temesi Recycling ceased all operations in 2022 after losing its roof to a tropical storm in December 2021 — the project is no longer generating the claimed emission reductions
  • 17 material findings and 13 corrective actions in the 2023 verification report, including missing legal ownership documents, unverified financial and market barrier evidence, and inconsistent baseline/project emission calculations
  • No annual monitoring reports were submitted for any monitoring year, and the sampling plan for surveys was not provided initially
  • Leakage justification is contradictory: the 2023 verification report states leakage was 'quantified' while the 2020 monitoring report states it was 'deemed negligible', yet the deduction is 0% in both cases
  • Total ERR figures are inconsistent across verification reports: 9,198 tCO₂e (2023 report) versus 16,026 tCO₂e (2021 report), with no clear explanation of the scope difference

Credit Vintages Exhausted

IssuedRetiredAvailable
2018
71710
2019
7,9537,9530
2020
7,9977,9970
Total16,02116,0210

Risk Indicators

Additionality

Barrier test VVB-confirmed but justification evidence missing

Permanence

Facility ceased operations in 2022

Leakage

0% deduction with contradictory justification across reports

Baseline

Project-specific modeled baseline; no reassessment date recorded

Safeguards

Grievance mechanism and benefit sharing mentioned; FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04AMS-III.F.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents