Gongba River Small Hydropower Project in Gansu Province

CDM-4347 ↗

#1311of 1935 in Renewable energy#791of 1084 in China#1037of 1459 in CDM (UNFCCC)#424of 806 in AMS-I.D

4.7/ 10
Integrity
6.0
Transparency
3.5
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A small hydro CDM project in Gansu, China, with VVB-confirmed additionality and a reasonable negligible-leakage claim, but undermined by a seven-fold discrepancy in claimed emissions reductions between the PDD and the validation report, a contradictory baseline-method description, eight unresolved material findings, and a near-total absence of monitoring or verified-emissions data. The low extraction confidence and missing key records further limit confidence in the project's reported performance.

Red Flags

  • ERR contradiction: the validation report states 56,840 tCO₂ while the PDD states 397,880 tCO₂ for the same crediting period — a 7× discrepancy that cannot be reconciled from available documents
  • Baseline method is described as 'project' in the validation report but 'jurisdictional' in the PDD, creating ambiguity about the actual baseline construction
  • Eight material findings (CARs and CLs) were raised by the VVB, including missing IRR parameters, undefined plant load factor, and non-compliant emission-factor calculations
  • No monitoring-period data, verified ERR figures, or usage-monitoring method found in any available document
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance-type hydro, low reversal risk

Leakage

0% deemed negligible, reasonable for grid displacement

Baseline

Method contradiction: project vs jurisdictional

Safeguards

Mentioned but no FPIC or grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents