Gongba River Small Hydropower Project in Gansu Province
#1311of 1935 in Renewable energy#791of 1084 in China#1037of 1459 in CDM (UNFCCC)#424of 806 in AMS-I.D
Audit Analysis
A small hydro CDM project in Gansu, China, with VVB-confirmed additionality and a reasonable negligible-leakage claim, but undermined by a seven-fold discrepancy in claimed emissions reductions between the PDD and the validation report, a contradictory baseline-method description, eight unresolved material findings, and a near-total absence of monitoring or verified-emissions data. The low extraction confidence and missing key records further limit confidence in the project's reported performance.
Red Flags
- ERR contradiction: the validation report states 56,840 tCO₂ while the PDD states 397,880 tCO₂ for the same crediting period — a 7× discrepancy that cannot be reconciled from available documents
- Baseline method is described as 'project' in the validation report but 'jurisdictional' in the PDD, creating ambiguity about the actual baseline construction
- Eight material findings (CARs and CLs) were raised by the VVB, including missing IRR parameters, undefined plant load factor, and non-compliant emission-factor calculations
- No monitoring-period data, verified ERR figures, or usage-monitoring method found in any available document
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance-type hydro, low reversal risk
0% deemed negligible, reasonable for grid displacement
Method contradiction: project vs jurisdictional
Mentioned but no FPIC or grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →