Graneros Plant Fuel Switching Project
#185of 202 in Industrial#8of 8 in Chile#205of 213 in CDM (UNFCCC)
Audit Analysis
The project shows significant gaps in additionality verification, baseline reassessment, and verified emission data, limiting confidence in credit quality. While leakage was addressed qualitatively and no material findings were reported, the outdated monitoring period and missing registry details further weaken reliability.
Red Flags
- No additionality test type or VVB confirmation documented
- Verified emission reductions and crediting period are missing from the record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 21,094 | 0 | 21,094 | |
| 2008 | 15,489 | 0 | 15,489 | |
| Total | 36,583 | 0 | 36,583 |
Risk Indicators
No additionality assessment found
Reversal risk unaddressed
Quantified justification but deduction value missing
Project-specific baseline without reassessment date
Partially documented
Status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →