Grassland Restoration and Stewardship in South Africa (GRASS)
#69of 261 in Soil carbon#11of 59 in South Africa#591of 1339 in Verra (VCS)#5of 25 in VM0042
Audit Analysis
The GRASS grassland restoration project in South Africa has a verified additionality assessment and a 12% buffer pool, but is undermined by extensive material findings on non-permanence, a project-specific baseline, and contradictory leakage justifications across documents. The first monitoring period delivered only about 42% of the pro-rata ex-ante expectation, suggesting the lifetime estimate may be optimistic. Multiple unresolved concerns from commenters about permanence and the 'theoretical' nature of the credits, combined with 30+ corrective actions, indicate a project still maturing in its MRV and risk management.
Red Flags
- The 2026 verification report states reversal events were 'not addressed,' a regression from the 2025 report which confirmed none were reported — this gap in the most recent verification is a permanence concern
- Commenters explicitly described the credits as 'theoretical with limited impact' and questioned the permanence of a grassland project, raising fundamental questions about the robustness of the soil carbon claims
- Leakage justification shifted from 'quantified' in the 2023 validation report to 'deemed negligible' in the 2026 verification report, with a 0% deduction — the basis for this change is not clearly documented
- The ex-ante lifetime estimate was revised upward from 14.66 million (PDD, 2022) to 19.19 million tCO2e (validation report, 2023), a 31% increase, yet the first monitoring period delivered only 42% of the pro-rata expectation, suggesting the revised estimate may still be optimistic
- 30+ corrective actions were required across validation and verification, including issues with non-permanence risk scoring, baseline scenario description, and monitoring plan adequacy
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 4,750 | 4,750 | 0 | |
| 2022 | 97,440 | 7,083 | 90,357 | |
| 2023 | 164,064 | 0 | 164,064 | |
| Total | 266,254 | 11,833 | 254,421 |
Risk Indicators
VVB-confirmed combined test
Buffer pool present but reversals not addressed in latest VR
0% deduction, justification inconsistent across documents
Project-specific baseline, reassessment not yet due
FPIC and grievance present but safeguards documentation flagged as insufficient
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →