Green Assets � Carolina Bays and Coastal Plain Forest Conservation & Sustainable Management Project
#40of 69 in REDD+#67of 115 in United States#15of 45 in American Carbon Registry (ACR)
2.8/ 10
Audit Analysis
The project design shows foundational conservation planning but lacks critical verification and monitoring data. Without additionality confirmation, baseline reassessment records, or leakage treatments, quality assessment remains highly constrained until supplementary reports are provided.
Red Flags
- No additionality test type or VVB verification status found in available documents
- Missing buffer pool percentage and leakage deduction for a forest conservation project
- Evidence relies solely on a single Project Design Document with no monitoring or verification reports
- Leakage not addressed in project documentation
- Buffer pool size not disclosed in available documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Additionality
Not assessed
Permanence
Unaddressed
Leakage
Missing
Baseline
Not stated
Safeguards
Absent
Double-claim
Status unknown
⚑ Dispute this rating
Analysis ProvenanceScored2026-08-07General Methodology v2.0
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →