Green House Gas Abatement through installation of a wind power project for export to the Grid.
#182of 1935 in Renewable energy#90of 975 in India#108of 1459 in CDM (UNFCCC)#127of 1287 in ACM0002
Audit Analysis
A CDM wind power project in India with a solid additionality case (combined test confirmed by DNV, IRR below benchmark without CERs) and a jurisdictional grid-emission-factor baseline. The project delivered only about 16% of its pro-rata expected emissions reductions over the elapsed monitoring period, which eliminates over-crediting risk but raises questions about the accuracy of the initial ex-ante estimate. Safeguards documentation (FPIC, grievance mechanism) is absent from the extracted record.
Red Flags
- Verified ERR of 34,821 tCO2e over ~8 years is only ~16% of the pro-rata expectation (~216,000 tCO2e) derived from the 273,935 tCO2e lifetime estimate, suggesting the initial ex-ante estimate was substantially overstated or the project operated well below design capacity
- Crediting period is stated as 2013–2022 in the 2020 monitoring report but 2012–2021 in the 2013 monitoring report; the discrepancy is unresolved in the extracted record
- No FPIC or grievance mechanism is documented in any available source, despite safeguards being mentioned and benefit sharing described
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 274,888 | 0 | 274,888 | |
| Total | 274,888 | 0 | 274,888 |
Risk Indicators
VVB-confirmed combined test; IRR below benchmark
Avoidance project; no reversal risk or events
0% deduction; deemed negligible for grid export
Jurisdictional grid EF (CEA data, 0.91 tCO2e/MWh)
Mentioned but no FPIC or grievance mechanism documented
CORSIA and CCP status not stated in any document
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →