Audit Analysis
A CDM biomass boiler project in India with a confirmed investment-test additionality assessment by SGS UK, but significant gaps in leakage treatment (contradicted between PDD and validation report), no monitoring or verification data available, and a project-specific baseline. The low extraction confidence and absence of any post-validation monitoring records limit the ability to verify actual emissions reductions against the 195,120 tCO2e lifetime claim.
Red Flags
- Leakage treatment is contradictory: the PDD (March 2011) states leakage was quantified, but the validation report (March 2011, 9 days later) records it as not addressed — a material gap for a biomass project where feedstock diversion is a realistic leakage pathway
- No monitoring reports, verification reports, or actual emissions reduction data were found in the extracted record, making it impossible to confirm the 195,120 tCO2e claim was delivered
- Nine Corrective Action Requests were raised during validation (all subsequently closed), indicating non-trivial documentation or methodology issues at the time of approval
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and critical data may be missing from the record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test confirmed by VVB
No reversal data; CDM permanence mechanism not detailed
Contradicted: PDD says quantified, VVB says not addressed
Project-specific baseline; no reassessment date stated
Safeguards mentioned; benefit sharing described; FPIC and gr
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →