Grid connected 3MWp Solar PV power plant in Belgum District of Karnataka State, India
#256of 1935 in Renewable energy#130of 975 in India#159of 1459 in CDM (UNFCCC)#96of 806 in AMS-I.D
Audit Analysis
A 3 MWp grid-connected solar PV project in Karnataka, India, registered under CDM with a jurisdictional baseline and VVB-confirmed investment additionality test. The project delivered approximately 79% of its pro-rata ex-ante expectation over the first four-year monitoring period, indicating conservative crediting. However, the validation process surfaced 21 material findings spanning PDD factual errors, financial analysis weaknesses, and calibration lapses, which, while corrected, reflect a below-average documentation quality.
Red Flags
- 21 material findings raised by TÜV NORD CERT during validation, including PDD array count error (12 vs. 624), incorrect geographical coordinates, and multiple financial analysis deficiencies (PLF, O&M, depreciation, tax treatment)
- Performance loss factor assumed at 17% was questioned by the VVB as not conservative compared to the CERC-recommended 19%, and the host submitted a KREDL letter as evidence rather than independent measurement
- Calibration of the smart meter was performed twice over the monitoring period instead of annually as specified in the PDD, with a conservative MPE of ±1% applied as a mitigation
- Total verified ERR figure is not present in the extracted record, preventing independent cross-check of the 13,277 tCO₂e figure reported in the monitoring report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 13,279 | 0 | 13,279 | |
| Total | 13,279 | 0 | 13,279 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Negligible, grid-connected output
Jurisdictional grid EF (2009)
Mentioned but FPIC/grievance not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.