Grid-connected electricity generation from 21 MW wind energy by GACL in Gujarat
#305of 1935 in Renewable energy#161of 975 in India#196of 1459 in CDM (UNFCCC)#226of 1287 in ACM0002
Audit Analysis
A standard 21 MW grid-connected wind project in Gujarat validated under CDM with a well-supported investment-test additionality assessment and an appropriate grid-based baseline. The project carries no inherent permanence risk and a defensible zero-leakage claim, but the absence of any monitoring-period data or verified emission reductions limits confidence in actual delivery. Documentation is adequate at the validation stage but thin on operational evidence.
Red Flags
- No monitoring-period data or verified emission reductions are available in the extracted record, making it impossible to confirm actual delivery against the 390,320 tCO2e lifetime claim.
- The baseline method is classified as 'project' in the validation report but 'jurisdictional' in the PDD — a classification inconsistency that, while likely immaterial for a grid-connected wind project, signals imprecise documentation.
- The grid emission factor of 0.9225 tCO2/MWh is from 2009 and has not been updated; for a CDM project this is standard practice, but it means the baseline reflects a single-year snapshot rather than a rolling average.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Zero deduction, physically justified
Grid-based but classification inconsistent across docs
Safeguards mentioned, FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →