Skip to main content
CDMWindIndiaACM0002

Grid-connected electricity generation from 39 MW wind energy by GACL in Gujarat

CDM-7092 ↗

#1246of 1935 in Renewable energy#660of 975 in India#972of 1459 in CDM (UNFCCC)#966of 1287 in ACM0002

4.8/ 10
Integrity
6.0
Transparency
3.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A 39 MW grid-connected wind project in Gujarat validated under CDM with a combined additionality test confirmed by TÜV NORD CERT. The project's integrity is supported by standard wind-avoidance logic and a reasonable 0% leakage deduction, but the absence of any monitoring reports, verified emission reductions, or post-validation data severely limits the ability to confirm actual performance. Multiple contradictions between the PDD and validation report, combined with low extraction confidence, reduce confidence in the extracted record.

Red Flags

  • No monitoring reports or verified emission reduction figures are available in the extracted record, making it impossible to confirm the 715,660 tCO2e lifetime claim
  • Baseline method is contradictory: the validation report (2012) labels it 'project' while the PDD (2012) labels it 'jurisdictional' — a material discrepancy for a grid-connected wind project
  • 20 material findings were logged during validation, indicating the initial project documentation required substantial correction before VVB approval

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test confirmed by VVB

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible, appropriate for wind

Baseline

Project vs. jurisdictional contradiction unresolved

Safeguards

Safeguards mentioned but FPIC and grievance mechanism not do

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents