Audit Analysis
A 39 MW grid-connected wind project in Gujarat validated under CDM with a combined additionality test confirmed by TÜV NORD CERT. The project's integrity is supported by standard wind-avoidance logic and a reasonable 0% leakage deduction, but the absence of any monitoring reports, verified emission reductions, or post-validation data severely limits the ability to confirm actual performance. Multiple contradictions between the PDD and validation report, combined with low extraction confidence, reduce confidence in the extracted record.
Red Flags
- No monitoring reports or verified emission reduction figures are available in the extracted record, making it impossible to confirm the 715,660 tCO2e lifetime claim
- Baseline method is contradictory: the validation report (2012) labels it 'project' while the PDD (2012) labels it 'jurisdictional' — a material discrepancy for a grid-connected wind project
- 20 material findings were logged during validation, indicating the initial project documentation required substantial correction before VVB approval
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test confirmed by VVB
mixed evidence / unresolved risk
0% deemed negligible, appropriate for wind
Project vs. jurisdictional contradiction unresolved
Safeguards mentioned but FPIC and grievance mechanism not do
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.