Grid Connected Wind Power Project by Madurai Integrated Textile Park Limited
#1171of 1935 in Renewable energy#609of 975 in India#894of 1459 in CDM (UNFCCC)#379of 806 in AMS-I.D
Audit Analysis
A grid-connected wind power project in India using the well-established AMS-I.D methodology with a jurisdictional baseline and VVB-confirmed investment additionality. The project is fundamentally sound in design (no reversal risk, appropriately negligible leakage), but the validation and monitoring reports contain 22 material findings—many concerning the investment analysis, meter calibration, and PDD completeness—that undermine confidence in the robustness of the additionality claim and the quality of MRV data.
Red Flags
- 22 material findings in the validation/monitoring record, including multiple deficiencies in the investment analysis (benchmark mark, IRR calculation, tax shield, sensitivity analysis), yet no corrective actions were formally recorded
- Energy meters were not calibrated per the monitoring plan frequency during the reporting period, and a 0.5% permissible error was applied to measured values due to delayed calibration
- Unique identification details for all wind turbines were missing from the PDD, and the single-line diagram was absent
- The monitoring report does not state a verified ERR figure, leaving the actual credit quantity unconfirmed in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 8,866 | 0 | 8,866 | |
| Total | 8,866 | 0 | 8,866 |
Risk Indicators
VVB-confirmed but 22 findings challenge investment analysis
Avoidance project, no reversal risk or events
Deemed negligible, appropriate for grid-connected wind
Jurisdictional grid EF, standard method
Safeguards and benefit-sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →