Grid connected wind power project in India by SRB Consultancy Pvt. Ltd
#948of 1935 in Renewable energy#481of 975 in India#689of 1459 in CDM (UNFCCC)#311of 806 in AMS-I.D
Audit Analysis
A CDM wind power project in India with a sound jurisdictional baseline and VVB-confirmed investment additionality, but severely limited verification data — no monitoring reports, no verified emission reductions, and low extraction confidence across the document set. Seven material findings during validation (IRR calculation errors, incomplete monitoring plan, missing stakeholder documentation) were all resolved, but the absence of any post-validation monitoring data leaves the 83,280 tCO₂e claim unverified.
Red Flags
- No monitoring report or verified emission reduction figure found in any available document — the 83,280 tCO₂e lifetime claim is entirely unverified
- Minimum extraction confidence rated low, indicating at least one key document was poorly readable or incomplete
- Seven material findings during validation including IRR calculation errors (tax depreciation, MAT, CER income period) and an incomplete monitoring plan, all resolved but indicating initial PDD weaknesses
- One document in the evidence list is labelled 'unknown' with no identifiable source or date
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Deemed negligible, appropriate for wind
Jurisdictional grid EF (0.9161, 2011)
Mentioned, benefit sharing described, no FPIC or grievance d
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →