Grouped Hydropower Plants in Chongqing, Yunnan,Sichuan and Guizhou Provinces, P.R. China

VCS-438 ↗

#1488of 1935 in Renewable energy#925of 1084 in China#1065of 1339 in Verra (VCS)#502of 806 in AMS-I.D

4.3/ 10
Integrity
4.8
Transparency
4.2
Claim Safety
4.3
Documentation
3.5

Audit Analysis

A large grouped small-scale hydropower project (88–98 plants) with VVB-confirmed additionality and a jurisdictional baseline, but undermined by a significant grid emission factor discrepancy between verification reports, a resolved but serious double-counting risk with the Chongqing ETS, numerous calculation errors and corrective actions, and a low extraction confidence rating that limits confidence in the extracted data. The project is inherently low-risk on permanence (hydropower, no reversal risk) and leakage (electricity to grid), but the volume of material findings and contradictions across documents raises meaningful concerns about data reliability and over-crediting risk.

Red Flags

  • Grid emission factor contradiction: the 2022 verification report cites 0.5003 tCO2/MWh while the 2017 verification report cites 0.9735 tCO2/MWh, and the baseline methodology section shows weighted averages of 0.8959 (CSPG) and 0.9515 (CCPG) — a factor-of-two discrepancy that directly affects credit quantities
  • Double-counting risk with the Chongqing ETS compliance period (2013–2015) was identified in the verification report; 7 hydro plants in Chongqing had to be excluded and 36,001 tCO2e removed from the 2013–2015 period
  • Project performance achieved only circa 66% of expected results (1,016,115 vs 1,539,874 credits) per the verification report, yet the verified ERR for the 2020–2021 monitoring period (363,333 tCO2e) is roughly 8.5× the pro-rata expectation derived from the 3,696,995 tCO2e lifetime ex-ante estimate — an inconsistency that cannot be reconciled without further data
  • FPIC was not conducted and no grievance mechanism is documented, despite stakeholder consultation being carried out through the EIA process
  • Min extraction confidence is rated low, meaning at least one key document was poorly readable, reducing reliability of all extracted figures

Credit Vintages

IssuedRetiredAvailable
2006
403,744312,80790,937
2007
716,865683,29533,570
2008
706,620706,6200
2009
489,430475,63813,792
2010
557,831557,613218
2011
459,727459,7270
2012
565,116564,805311
2013
455,081455,0810
2014
581,673580,697976
2015
665,334663,6671,667
2016
283,041283,0410
2017
363,844363,8440
2018
327,905327,9050
2019
345,001345,0010
2020
323,983323,9830
2021
73,23773,2370
Total7,318,4327,176,961141,471

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Hydropower – no reversal risk

Leakage

0% deemed negligible; prior quantification shifted

Baseline

Jurisdictional but grid EF contradiction unresolved

Safeguards

EIA and consultation done; FPIC and grievance mechanism absent

Double-claim

ETS overlap corrected; CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09AMS-I.D., Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents