Audit Analysis
A VCS-registered safe drinking water project in Malawi using the AMS-III.AV methodology, with VVB-verified additionality and a quantified 5% leakage deduction. However, the absence of a stated buffer pool, unaddressed reversal risk for this avoidance-type project, a project-specific baseline with no documented reassessment, and 31 corrective actions raised during verification indicate meaningful gaps in robustness. The project delivered approximately 75% of its pro-rata ex-ante expectation for the elapsed monitoring period, suggesting conservative crediting.
Red Flags
- No buffer pool percentage stated in any available document, and reversal events are explicitly 'not addressed' for an avoidance-type project where beneficiaries could revert to energy-intensive water treatment
- 31 corrective actions and 24 material findings raised during verification, including missing sampling sheets, confidence/precision calculations, and incomplete baseline survey documentation
- fNRB value contradiction: 0.7 (national default, verification report) vs 0.9549 (local field, PDD) — the lower value was privileged but the method discrepancy (national_default vs local_field) remains unresolved
- Benefit sharing described as present in the validation report but absent in the more recent verification report, creating uncertainty about stakeholder benefit distribution
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 1,000 | 0 | 1,000 | |
| Total | 1,000 | 0 | 1,000 |
Risk Indicators
VVB-verified combined test
reversal risk unaddressed
5% quantified deduction
Project-specific; no reassessment date stated
FPIC conducted; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →