Grouped Projects for Safe Water Program in Uganda
#16of 108 in Water#8of 163 in Uganda#222of 1339 in Verra (VCS)#4of 72 in AMS-II.I
Audit Analysis
A VCS-registered safe drinking water project in Uganda using the AMS-III.AV methodology, with solid additionality (combined test, VVB-verified) and a quantified 5% leakage deduction. However, the project carries notable gaps: permanence risk is unaddressed with no buffer pool, the baseline is project-specific rather than jurisdictional, and 17 material findings (including calculation errors and missing installation records) were raised during verification, all subsequently closed. The project delivered approximately 76% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative crediting.
Red Flags
- Permanence risk is explicitly not addressed: no buffer pool percentage is stated and the project proponent has not determined a non-permanence risk rating, leaving reversal exposure unquantified
- 17 material findings were raised during verification, including use of an outdated household size (4.6 vs. the correct 4.2 from the 2024 census), emission reduction calculations initially extending beyond the crediting period end-date, and missing dispenser installation records
- Benefit sharing is described as present in the validation report but absent in the more recent verification report, creating an unresolved contradiction on a key social-safeguard element
- The fNRB value differs substantially between the PDD (0.8857) and the verification report (0.655), a 26% discrepancy that affects baseline emission calculations
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 1,000 | 0 | 1,000 | |
| Total | 1,000 | 0 | 1,000 |
Risk Indicators
Combined test, VVB-verified
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, not jurisdictional
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →