Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

GS10789 GS11673 RVPA-63: Efficient and Clean Cooking for households in Nigeria

GS-4386 ↗ · current registry ID: GS12282

#758of 1329 in Industrial#44of 79 in Nigeria#1145of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
3.8
Documentation
5.0

Audit Analysis

This Gold Standard cookstove project in Nigeria has VVB-confirmed additionality and a quantified 5% leakage deduction, but is undermined by a project-specific baseline, no buffer pool, a significant fNRB discrepancy between documents (0.85 vs 0.64), and a verified ERR roughly five times the pro-rata ex-ante expectation for the monitoring period. The verification report lists over thirty material findings and corrective actions, including calculation errors, baseline fuel inconsistencies, and unresolved double-counting questions, which collectively erode confidence in the robustness of the credit claims.

Red Flags

  • Verified ERR of 119,441 tCO₂e for a ~4-month monitoring period is approximately 5× the pro-rata expectation derived from the ex-ante lifetime estimate of 358,068 tCO₂e (358,068 × 4/60 ≈ 23,871), a discrepancy explicitly flagged in the verification report as a 'significant increase in VERs compared to ex-ante estimates.'
  • fNRB value of 0.8497 in the verification report versus 0.64 in the validation report represents a 33% difference in the fuel non-replacement baseline, directly affecting the magnitude of claimed reductions.
  • Over thirty material findings and corrective actions were raised in the verification report, including calculation errors in the ER sheet, baseline fuel inconsistencies (LPG vs charcoal), and unresolved double-counting prevention mechanisms.
  • Baseline is project-specific rather than jurisdictional, and the fNRB is derived from a national default with a noted discrepancy against FAO website data.

Credit Vintages

IssuedRetiredAvailable
2024
119,4410119,441
Total119,4410119,441

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

stove attrition risk unaddressed

Leakage

5% quantified deduction

Baseline

Project-specific; fNRB contradicts validation report

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents