GS10789 GS11673 RVPA-67: Efficient and Clean Cooking for households in Nigeria
GS-4389 ↗ · current registry ID: GS12295
#145of 1329 in Industrial#1of 79 in Nigeria#270of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard improved cookstove project in Nigeria with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a verified usage rate (50.67%) far below the ex-ante assumption (85%), the absence of a buffer pool, and an extensive list of material findings and corrective actions spanning 30+ items. The project over-delivers relative to its lifetime ex-ante estimate, which is reassuring for credit validity, but the volume of documentation corrections and inter-document contradictions raises reliability concerns.
Red Flags
- Verified usage rate of 50.67% is less than two-thirds of the 85% ex-ante assumption, indicating significant adoption barriers that were not adequately captured in the baseline
- 30+ corrective actions and material findings across the verification and validation reports, including data transfer errors, copy-paste mistakes, and missing evidence for EIA exemptions and grievance mechanisms
- fNRB value contradicts between documents (0.8497 in verification report vs 0.64 in validation report), with the lower value potentially underestimating baseline emissions and overestimating reductions
- Stove lifetime (10 years) and attrition/replacement approach flagged as requiring justification in multiple material findings
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 96,138 | 0 | 96,138 | |
| 2025 | 15,021 | 0 | 15,021 | |
| Total | 111,159 | 0 | 111,159 |
Risk Indicators
VVB-confirmed combined test
stove lifetime unverified
5% quantified deduction
Project-specific; fNRB contradiction
FPIC, grievance, benefit sharing documented
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →