GS10789 VPA9: Efficient and Clean Cooking for households in Mozambique
GS-3654 ↗ · current registry ID: GS11605
#1140of 1329 in Industrial#43of 51 in Mozambique#1593of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard cookstove project in Mozambique has a VVB-confirmed additionality assessment and no reported reversals, but is undermined by 14 cross-document contradictions, over 25 corrective actions and clarifications, a project-specific baseline, and a verified usage rate (65.5%) far below the assumed 90%. The verified emissions reductions for the monitoring period represent only about 58% of the pro-rata lifetime expectation, indicating the initial assumptions were overly optimistic.
Red Flags
- 14 contradictions between documents, including fNRB value (0.88 vs 0.64), usage rate (65.5% vs 96%), FPIC status (conducted vs not conducted), and crediting period dates
- Verified ERR (45,113) is only 37% of the claimed ERR (122,470) in the same monitoring period, indicating a major over-claim in the monitoring report
- FPIC was not conducted per the most recent verification report (Jan 2026), contradicting the earlier validation report
- Safeguards and benefit-sharing are not documented in the most recent verification report, despite a grievance mechanism being in place
- Over 25 corrective actions and clarifications remain open, including additionality at PoA level, double-counting prevention, and carbon ownership transfer
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 45,113 | 0 | 45,113 | |
| Total | 45,113 | 0 | 45,113 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0–5% deduction, justification inconsistent
Project-specific, reassessed 2025
FPIC not conducted, safeguards undocumented
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →