GS10959 VPA02 Safe Water Project in Rwanda II
GS-3088 ↗ · current registry ID: GS11133
#244of 1329 in Industrial#21of 139 in Rwanda#417of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard water-purification project in Rwanda that displaces thermal energy (boiling) with a verified 100% usage rate and no over-crediting in the reporting period. However, multiple material findings, a corrective action on potential double claiming, a project-specific baseline, and the absence of a stated buffer pool or additionality test type limit confidence in the integrity and claim-safety profile.
Red Flags
- Corrective action requires the project developer to clarify whether access to alternative water-purification technology is covered under another project and how double claiming is avoided
- Additionality test type is not stated in the extracted record despite VVB confirmation, limiting traceability of the additionality argument
- Crediting period dates differ between the PDD (2022-05-01 to 2027-04-30) and the verification report (2021-11-27 to 2026-11-26), creating ambiguity about the actual crediting window
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 5,158 | 5,158 | 0 | |
| 2022 | 54,005 | 10,526 | 43,479 | |
| 2023 | 55,294 | 0 | 55,294 | |
| 2024 | 30,558 | 0 | 30,558 | |
| Total | 145,015 | 15,684 | 129,331 |
Risk Indicators
VVB-confirmed but test type not stated
no reversals reported
Negligible with justification; appropriate for project type
Project-specific; no reassessment date stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA/CCP not stated; open corrective action on double claiming
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →