GS11638 VPA-1 SPOUTS Water Purifier Programme in Africa- WPS in Rwanda- VPA 1
GS-3638 ↗ · current registry ID: GS11639
#8of 1329 in Industrial#2of 139 in Rwanda#37of 1801 in Gold Standard (GS)
Audit Analysis
The SPOUTS Water Purifier Programme in Rwanda is a well-structured energy-efficiency project with VVB-confirmed additionality, a quantified 5% leakage deduction, and a reasonable 89.8% ER verification rate. However, the project-specific baseline, absence of a stated buffer pool, several outstanding corrective actions (including fNRB update and full water quality testing), and a long list of resolved clarifications and CARs temper the overall quality assessment. CORSIA eligibility introduces a modest dual-channel risk.
Red Flags
- Three outstanding Findings of Additional Requirements (FAR#01–FAR#03) remain unresolved, including the need to update the fNRB value per the 2025 GS4GG Rule Update and to conduct full water quality testing for Salmonella and Shigella from the next monitoring period.
- The crediting period start date differs between two verification reports (2023-07-11 vs 2023-11-07), and a corrective action requires the project proponent to provide end-user agreements to support the start date.
- CORSIA eligibility is confirmed while CCP status is not stated, creating a potential dual-channel allocation risk.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 20,657 | 0 | 20,657 | |
| 2024 | 18,045 | 0 | 18,045 | |
| Total | 38,702 | 0 | 38,702 |
Risk Indicators
Combined test, VVB-confirmed
low inherent reversal risk
5% quantified deduction with justification
Project-specific; reassessment timing not stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →