GS11677 GS11902 Malawi Biomass Energy Conservation Programme CPA 13
GS-3927 ↗ · current registry ID: GS11913
#113of 1329 in Industrial#20of 92 in Malawi#229of 1801 in Gold Standard (GS)#30of 189 in AMS-II.G
Audit Analysis
A Gold Standard biomass cookstove project in Malawi with VVB-confirmed additionality, a quantified 5% leakage deduction, and no reported reversal events. However, the project relies on a project-specific baseline, the verified usage rate shows a notable discrepancy between reporting periods, and seven contradictions across documents—including a significant crediting-period mismatch—undermine confidence in the data record. The exact match between claimed and verified ERR (1,534,828) is transparent but leaves no independent ex-ante lifetime estimate against which to judge over- or under-delivery.
Red Flags
- Crediting period stated as 2016-10-15 to 2025-03-31 in the monitoring report but 2021-10-15 to 2036-10-14 in the validation report — a 15-year discrepancy that affects the entire crediting framework
- Verified usage rate of 0.9206 (Aug 2023 verification) versus 0.7678 (Feb 2023 verification) — a 20% swing between two verification reports within the same year
- No lifetime ex-ante ERR estimate found in any document, making it impossible to assess whether the 1,534,828 tCO₂e verified figure is proportionate to the project's original design
- PDD (Jul 2020) lists a total ERR of 38,778 while the verification report (Aug 2023) reports 1,534,828 — a 40× difference that, while likely reflecting different time bases, is never reconciled in the available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 40,946 | 0 | 40,946 | |
| 2022 | 22,473 | 0 | 22,473 | |
| Total | 63,419 | 0 | 63,419 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
5% quantified deduction
Project-specific, reassessment date unknown
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →