GS11677 GS11902 Malawi Biomass Energy Conservation Programme CPA 16
GS-3930 ↗ · current registry ID: GS11916
#114of 1329 in Industrial#21of 92 in Malawi#230of 1801 in Gold Standard (GS)#31of 189 in AMS-II.G
Audit Analysis
A Gold Standard cookstove project in Malawi with a VVB-confirmed investment additionality test, a quantified 5% leakage deduction, and no reported reversals. However, a project-specific baseline, absence of a stated buffer pool, and several material contradictions in ERR figures and crediting period dates introduce meaningful uncertainty about the robustness of the credit claims. The documentation base is reasonably broad (32 documents) but extraction confidence is only medium and multiple administrative corrective actions were required.
Red Flags
- Contradiction in total ERR claimed: the monitoring report (Dec 2024) states 243,647 tCO₂e while the verification report (same date) references 760,155 tCO₂e — a 3.1× discrepancy that undermines confidence in the credit quantity.
- Crediting period is inconsistent across documents: the monitoring report gives 2016-10-15 to 2025-03-31, while the validation report gives 2021-10-15 to 2036-10-14, creating uncertainty about the project's actual lifetime and remaining credit potential.
- CORSIA eligibility and CCP status are both not stated in the extracted record, leaving dual-channel or double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 41,359 | 0 | 41,359 | |
| 2022 | 30,911 | 0 | 30,911 | |
| 2023 | 5,119 | 0 | 5,119 | |
| Total | 77,389 | 0 | 77,389 |
Risk Indicators
VVB-confirmed investment test
no reversals
5% quantified deduction
Project-specific; reassessment date not stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →