GS11677 GS11902 Malawi Biomass Energy Conservation Programme CPA 23
GS-3939 ↗ · current registry ID: GS11923
#82of 1329 in Industrial#12of 92 in Malawi#185of 1801 in Gold Standard (GS)#21of 189 in AMS-II.G
Audit Analysis
A Gold Standard improved-cookstove project in Malawi with VVB-confirmed additionality and a quantified 5% leakage deduction, but weakened by the absence of a buffer pool, a project-specific baseline, unresolved ERR figure discrepancies across documents, and outstanding corrective actions including a double-claiming verification. The project is functional and monitored via annual surveys, yet the data reliability issues and missing permanence safeguards prevent a higher rating.
Red Flags
- Unexplained discrepancy between the 243,647 tCO₂e figure in the monitoring report and the 760,155 tCO₂e figure in the verification report for the same 2024 period — potential over-crediting risk if the higher figure is used for issuance
- No buffer pool or permanence mechanism identified in any available document, leaving the project exposed to reversal risk if beneficiaries revert to traditional cooking
- Corrective action requires verification that no CER and GSVER are issued for the same vintage, indicating a residual double-claiming risk that has not yet been closed
- Crediting period is inconsistent across documents: 2016–2023 (monitoring report) vs 2021–2036 (validation report), creating uncertainty about the valid crediting window
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 41,106 | 0 | 41,106 | |
| 2022 | 30,724 | 0 | 30,724 | |
| 2023 | 17,430 | 0 | 17,430 | |
| Total | 89,260 | 0 | 89,260 |
Risk Indicators
VVB-confirmed investment test
no reversals but no safeguard
5% quantified deduction
Project-specific; reassessment date not stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA/CCP not stated; CER-GSVER check outstanding
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →