GS11935 GS11934 RVPA-04 Promoting sustainable use of biomass energy resources in targeted communities
GS-4680 ↗ · current registry ID: GS12703
#355of 1329 in Industrial#24of 101 in Nepal#576of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-verified additionality and a quantified 5% leakage deduction, but undermined by multiple significant data contradictions across documents (ERR figures differing by nearly 2×, fNRB values differing by a factor of 100, and a direct conflict on whether FPIC was conducted). The absence of a buffer pool, a project-specific baseline, and the aggressive 100% usage rate assumption introduce moderate over-crediting risk that is only partially offset by the use of a national-default fNRB.
Red Flags
- fNRB value contradicts between the verification report (91.44) and the monitoring report (0.9144) — a factor-of-100 discrepancy that undermines confidence in the emissions calculation
- FPIC status directly contradicted: the validation report (2023-11-30) confirms FPIC was conducted, while the PDD (2024-09-13) states it was not
- Usage rate shows a contradiction of 100% (2025 monitoring report) versus 1% (2024 monitoring report), a 100× difference that raises serious data-reliability questions
- ERR figures differ by nearly 2× between the validation report (47,333) and the verification report (91,239), and the basis for each figure is not clearly reconciled
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 179 | 0 | 179 | |
| 2023 | 9,309 | 0 | 9,309 | |
| 2024 | 2,321 | 0 | 2,321 | |
| Total | 11,809 | 0 | 11,809 |
Risk Indicators
VVB-confirmed combined test
no reversals
5% quantified deduction
Project-specific; reassessment not stated
FPIC contradicted; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →