Skip to main content
GSEnergy Efficiency - DomesticNepalGeneral Methodologyv2.1

GS11935 GS11934 RVPA-12 Promoting sustainable use of biomass energy resources in targeted communities

GS-4688 ↗ · current registry ID: GS12711

#676of 1329 in Industrial#68of 101 in Nepal#1025of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A Gold Standard cookstove project in Nepal with VVB-verified additionality and a quantified 5% leakage deduction, but significant gaps in permanence protection (no buffer pool), an aggressive 100% usage-rate assumption, and a notable five-fold discrepancy in ERR figures between the PDD and validation report. The absence of any monitoring data, low extraction confidence, and a contradiction on FPIC status limit confidence in the project's long-term integrity and transparency.

Red Flags

  • 100% usage rate assumed in the validation report with no monitoring data to support it; the PDD lists a value of 1.0, creating a five-order-of-magnitude ambiguity that undermines claim reliability
  • No buffer pool or permanence mechanism identified in any available document, leaving the project exposed to reversal risk from cookstove breakdown or replacement with inefficient alternatives
  • FPIC status contradicts between two validation reports (conducted per 2023-11-30 report; not conducted per 2024-09-27 report), raising safeguards concerns
  • ERR figures differ by a factor of five between the PDD (9,601 tCO2e) and the validation report (48,005 tCO2e); while this may reflect a per-year vs. lifetime basis, the discrepancy is not explicitly reconciled in the documents
  • Low extraction confidence across the document set, meaning key data points may be incomplete or misread

Credit Vintages

IssuedRetiredAvailable
2023
7,04307,043
2024
2,38202,382
Total9,42509,425

Risk Indicators

Additionality

VVB-verified combined test

Permanence

reversal risk unaddressed

Leakage

5% quantified deduction

Baseline

Project-specific; no reassessment date recorded

Safeguards

FPIC contradiction; grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents