GS11935 GS11934 RVPA-20 Promoting sustainable use of biomass energy resources in targeted communities
GS-4696 ↗ · current registry ID: GS12719
#148of 1329 in Industrial#13of 101 in Nepal#273of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove efficiency project in Nepal with VVB-confirmed additionality and no reversal events, but a significant discrepancy between the ex-ante estimate (43,761 tCO₂e) and the verified figure for a single monitoring year (71,608 tCO₂e) raises serious over-crediting concerns. The project-specific baseline, absence of FPIC per the most recent validation report, and identical claimed/verified ERR figures warrant caution. Documentation is reasonably complete with all corrective actions closed, but the ERR gap is the dominant risk.
Red Flags
- Verified ERR of 71,608 tCO₂e for one monitoring year exceeds the full ex-ante crediting-period estimate of 43,761 tCO₂e from the validation report by a factor of ~1.6×, implying delivery of roughly 818% of the pro-rata annual expectation — a major over-crediting signal
- FPIC was not conducted per the most recent validation report (Sep 2024), contradicting an earlier validation report (Nov 2023) that stated it was conducted
- Claimed and verified ERR figures are identical (71,608), with no visible independent adjustment by the VVB
- Crediting period dates differ between the monitoring report (2023-05-30 to 2028-05-29) and an earlier document (2022-10-01 to 2027-10-01), suggesting a revision that is not clearly documented
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 4,983 | 0 | 4,983 | |
| 2024 | 2,170 | 0 | 2,170 | |
| Total | 7,153 | 0 | 7,153 |
Risk Indicators
VVB-confirmed combined test
Efficiency project, no reversals
5% quantified deduction
Project-specific, not jurisdictional
FPIC not conducted (most recent report); grievance mechanism present
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →