GS11935 GS11934 RVPA-23 Promoting sustainable use of biomass energy resources in targeted communities
GS-4699 ↗ · current registry ID: GS12723
#356of 1329 in Industrial#25of 101 in Nepal#577of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with a solid combined additionality test verified by the VVB and a quantified 5% leakage deduction, but undermined by a 13-year-old baseline survey (2010) that was specifically flagged by the CME, no documented reversal or permanence protection, and the absence of any monitoring-period data to verify the 47,333 tCO2e ex-ante estimate. Multiple contradictions between the PDD and validation report, combined with low extraction confidence, reduce confidence in the overall data quality.
Red Flags
- Baseline survey conducted in 2010 for a project with a 2023 crediting start — the CME explicitly raised FAR 4 questioning the relevance of this 13-year-old survey for firewood consumption
- Reversal events are listed as 'not addressed' and no buffer pool percentage is stated, leaving cookstove breakage/abandonment risk unmitigated
- Low extraction confidence across the document set, with at least one source document identified only as 'unknown'
- No monitoring-period data or monitoring report is available; the claimed and verified ERR figures are identical (47,333 tCO2e), indicating the ex-ante estimate has not yet been independently verified against field data
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 5,132 | 0 | 5,132 | |
| 2024 | 2,347 | 0 | 2,347 | |
| Total | 7,479 | 0 | 7,479 |
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, 2010 survey flagged by CME
FPIC, grievance mechanism, benefit sharing documented
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →