GS11935 GS11934 RVPA-24 Promoting sustainable use of biomass energy resources in targeted communities
GS-4700 ↗ · current registry ID: GS12724
#679of 1329 in Industrial#71of 101 in Nepal#1028of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with verified additionality and quantified leakage, but significant gaps in permanence safeguards (no buffer pool or reversal data), an unverified 100% usage rate assumption, and a five-fold discrepancy in claimed emissions reductions between the PDD and validation report. The project relies on a 2010 baseline survey and lacks a monitoring report, limiting confidence in the claimed figures.
Red Flags
- Five-fold discrepancy in total ERR between the PDD (9,424 tCO2e) and the validation report (47,120 tCO2e) — the validation report value is privileged as the more recent and authoritative document, but the gap raises data-reliability concerns
- No buffer pool or permanence mechanism stated in any available document, leaving reversal risk unaddressed for a 5-year crediting period
- Baseline survey data dates from 2010 (flagged in FAR 4), raising questions about the currency and representativeness of the project-specific baseline
- 100% usage rate assumed with no verified usage data available (usage_rate_verified not stated in any document)
- No monitoring report or monitoring period found in the extracted record — all ERR figures derive from the validation report only
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 5,058 | 0 | 5,058 | |
| 2024 | 2,336 | 0 | 2,336 | |
| Total | 7,394 | 0 | 7,394 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, 2010 survey data
FPIC, grievance, benefit-sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →