GS11935 GS11934 RVPA-25 Promoting sustainable use of biomass energy resources in targeted communities
GS-4701 ↗ · current registry ID: GS12725
#357of 1329 in Industrial#26of 101 in Nepal#578of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with a solid additionality assessment (combined test confirmed by the VVB) and a quantified 5% leakage deduction, but weakened by an unaddressed permanence/reversal risk, a project-specific baseline with no reassessment date, an aggressive 100% usage-rate assumption, and a direct contradiction on whether FPIC was conducted. The validation process was thorough (multiple CLs, CARs, and FARs raised and closed), but the absence of a monitoring report and low document-extraction confidence limit confidence in the overall record.
Red Flags
- Reversal events are explicitly 'not addressed' and no buffer pool percentage is stated, leaving permanence risk unquantified for a 5-year crediting period
- 100% usage rate is assumed with no verified usage rate available, and the VVB raised a FAR questioning the relevance of a 2010 baseline survey for firewood consumption
- Direct contradiction between the validation report (FPIC conducted = yes) and the PDD (FPIC conducted = no) on a core safeguard requirement
- Feedstock sustainability and carbon content testing are not stated in any available document for a biomass-based project
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 4,797 | 0 | 4,797 | |
| 2024 | 2,347 | 0 | 2,347 | |
| Total | 7,144 | 0 | 7,144 |
Risk Indicators
Combined test confirmed by VVB
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, no reassessment date
FPIC contradiction; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →