GS11935 GS11934 RVPA-30 Promoting sustainable use of biomass energy resources in targeted communities
GS-4706 ↗ · current registry ID: GS12730
#358of 1329 in Industrial#27of 101 in Nepal#579of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-verified additionality and a quantified 5% leakage deduction, but undermined by a project-specific baseline, absence of a buffer pool, a contradictory FPIC record, and seven cross-document data inconsistencies (including unit errors and a 16% gap between the validation and verification ERR figures). The project is in its first monitoring year of a five-year crediting period, so the track record is still thin.
Red Flags
- FPIC status is contradictory: the earlier validation report (Nov 2023) records FPIC as conducted, while the later validation report (Sep 2024) records it as not conducted; the more recent document is privileged, leaving a safeguard gap.
- Seven fields show contradictions across documents, including a 16% discrepancy in the ERR figure (47,333 in the validation report vs 54,782 in the verification report) and unit-level errors (usage rate 1.0 vs 100; fNRB 0.9144 vs 91.44), indicating weak internal data quality control.
- The baseline is project-specific rather than jurisdictional, and the date of the last baseline reassessment is not stated in any available document.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 3,919 | 0 | 3,919 | |
| 2024 | 2,331 | 0 | 2,331 | |
| Total | 6,250 | 0 | 6,250 |
Risk Indicators
VVB-verified combined test
no reversals yet
5% quantified deduction
Project-specific; reassessment date not stated
Grievance & benefit-sharing present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →