Skip to main content
GSEnergy Efficiency - DomesticNepalGeneral Methodologyv2.1

GS11935 GS11934 RVPA-33 Promoting sustainable use of biomass energy resources in targeted communities

GS-4709 ↗ · current registry ID: GS12733

#504of 1329 in Industrial#45of 101 in Nepal#802of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A Gold Standard cookstove project in Nepal with a confirmed additionality test and quantified 5% leakage deduction, but undermined by an aggressive 100% usage-rate assumption, absence of a buffer pool, and a contradictory FPIC record between two validation reports. The low extraction confidence and lack of any monitoring-period data limit confidence in the claimed 48,189 tCO₂e lifetime figure.

Red Flags

  • FPIC status contradicts between the 2023 and 2024 validation reports; the more recent (2024-09-27) report states FPIC was NOT conducted
  • Usage rate assumed at 100% with no verified usage-rate data available, creating over-crediting risk
  • Total ERR in the PDD (9,637) is exactly one-fifth of the validation-report figure (48,189), suggesting a per-year vs. lifetime basis difference that is not explicitly reconciled in the documents
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable

Credit Vintages

IssuedRetiredAvailable
2023
3,36403,364
2024
2,37302,373
Total5,73705,737

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

cookstove use-dependent

Leakage

5% quantified deduction

Baseline

Project-specific; reassessment timing not stated

Safeguards

Grievance mechanism present; FPIC not conducted per 2024 report

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents