Skip to main content
GSEnergy Efficiency - DomesticNepalGeneral Methodologyv2.1

GS11935 GS11934 RVPA-38 Promoting sustainable use of biomass energy resources in targeted communities

GS-4714 ↗ · current registry ID: GS12738

#507of 1329 in Industrial#48of 101 in Nepal#805of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A Gold Standard cookstove project in Nepal using a standard simplified methodology, with VVB-confirmed additionality and a quantified 5% leakage deduction. However, the absence of a stated buffer pool, a contradiction on whether FPIC was conducted, and the lack of any monitoring-period data limit confidence in the project's long-term integrity and transparency. The ERR figures across documents are most likely an annual-versus-lifetime discrepancy (9,466 × 5 ≈ 47,333), which mitigates the apparent contradiction but still warrants clarification.

Red Flags

  • FPIC status is contradictory: the 2023-11-30 validation report states FPIC was conducted, while the more recent 2024-09-27 validation report states it was not — the more recent document is privileged, leaving a safeguards gap
  • No monitoring report or monitoring period is present in the extracted record; the verified ERR figure (47,333 tCO2e) appears to be the ex-ante validation figure rather than a post-implementation measurement
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of the extracted data

Credit Vintages

IssuedRetiredAvailable
2023
2,66302,663
2024
2,33102,331
Total4,99404,994

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal risk unquantified

Leakage

5% quantified deduction

Baseline

Project-specific baseline; no reassessment date

Safeguards

Grievance mechanism present; FPIC status contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents